A brewery business plan must turn brewing capacity into beer that can be sold and paid for. This worked example follows 24 batches into 43,200 bottles, of which 36,000 are invoiced and 33,000 have been paid for at a cash checkpoint. The distinction matters: its VAT-exclusive cash planning balance is £937.60 short after funding the stated bills and duty reserve, despite £93,600 of invoiced sales.

The business is fictional: an English limited company making one 4% ABV beer for wholesale in 500ml bottles. It has an equipped, already funded production site and a working director. It has no taproom, tours, online retail or export income in this example. Prices, yields, working time and costs are teaching inputs, not quotations or industry averages.

What this example tests. This is an operating and working-capital section of a business plan, not a complete start-up budget, valuation or set of accounts. Amounts are in GBP, excluding recoverable VAT and including any irrecoverable costs. The duty comparison deliberately uses the full rate without Small Producer Relief; the actual producer-specific rate must be established separately. Equipment purchases, opening funding, VAT settlement, Corporation Tax and borrowing are outside the cash calculation.

Start with the buyer and the bottle, not the brewhouse

The proposition is a consistent bottled beer for independent retailers that can reorder in manageable quantities. The assumed wholesale selling price is £2.60 per 500ml bottle, excluding VAT and including the brewery’s duty cost. It is the brewery’s selling price, not the shop’s shelf price. The sales hypothesis is 36,000 bottles over a planning year; no customer orders or distribution agreements have been obtained for this fictional case.

To test it, record each prospective buyer’s case quantity, reorder interval, accepted price, delivery requirement, payment terms and expected returns. A positive conversation is not a purchase order. Trial orders and subsequent paid reorders are more useful evidence than a general claim that craft beer is growing. Keep samples and discounts separate from full-price units.

The plan should explain why the shop would give this beer shelf space: a suitable style, dependable supply, tested shelf life, clear presentation and a margin that works for the buyer. Cost delivery by route and order size. Changing to a distributor or adding a taproom changes both revenue and costs; do not apply a direct retail price to wholesale volume.

Check the cellar calendar and the working time

Assume two nominal 1,000-litre fermentation vessels, a 21-day occupation cycle including turnaround, and a 330-day production window. The arithmetic ceiling is two vessels × 15 complete cycles = 30 batches. That is a ceiling under the assumptions, not a production promise. The plan schedules 24 batches, with 900 litres of saleable finished beer per batch.

A feasible simplified sequence starts a batch every 13 days, alternating vessels. Starts run from day 0 to day 299 and the last batch completes on day 320. Each vessel is reused after 26 days, leaving time within the assumed 21-day cycle. Actual recipes, conditioning, cleaning, equipment faults and quality-release procedures still need a dated schedule. A nominal tank volume is not the quantity you can bottle.

Illustrative annual output and productive time — one bottled-beer operation
Planning itemCalculationResult
Saleable finished beer24 batches × 900 litres21,600 litres
500ml bottles filled21,600 ÷ 0.543,200 bottles
Brewing and cellar work24 × 16 productive hours384 hours
Filling, labelling and associated packing work43,200 ÷ 200 bottles per productive hour216 hours
Sales, deliveries, records and other administrationAnnual allowance320 hours
Total productive time20 hours × 46 working weeks920 hours

The labour allowance is £18,000 annual business cost for the working director, including assumed employment charges, paid time away and cover arrangements. It is not a quoted salary or statutory pay rate. There is no separate full-time brewing team in this budget. Test the task durations and actual employment arrangements before relying on it: an automated filler’s headline speed is not the operator’s sustained packing rate, and fermentation time is not paid hands-on time.

Keep three counts: bottled, invoiced and paid

The year starts with no finished bottles. Of the 43,200 bottles produced, 36,000 are dispatched and invoiced, leaving 7,200 in stock. At the cash checkpoint, customers have paid for 33,000 of the invoiced bottles; the other 3,000 remain unpaid. There are therefore two different gaps, not one unexplained wastage figure.

Three nested counts in the fictional brewery year: 43,200 bottles produced, 36,000 invoiced and 33,000 paid for.
These counts overlap: invoiced bottles are part of production, and paid bottles are part of invoiced sales. Do not add the bars together. Open the larger bottles, sales and payments chart.
Illustrative stock and customer balances — 500ml bottles, England
ItemQuantityFinancial meaning
Finished bottles still held43,200 − 36,000 = 7,2003,600 litres not yet sold
Invoiced sales36,000 × £2.60£93,600 excluding VAT
Customer receipts at the checkpoint33,000 × £2.60£85,800 on the same VAT-exclusive basis
Unpaid customer invoices3,000 × £2.60£7,800 still to collect, excluding VAT

For non-labour production inputs, assume £900 per batch for ingredients, process energy, cleaning consumables and related inputs, plus £0.40 per filled bottle for packaging. Annual spending is £21,600 + £17,280 = £38,880, or £0.90 per filled bottle. It covers all 43,200 bottles, including unsold stock. Do not cost only the 36,000 sold and forget the purchases already needed to make the rest.

The 7,200 unsold bottles have absorbed £6,480 of these particular inputs. That is not their statutory inventory valuation: it excludes allocations such as production labour and overheads. It is also not an extra annual cash payment to add again. Check storage capacity, batch traceability, shelf life and dated dispatches; an annual total cannot show whether a buyer’s order can be fulfilled in its required week.

Calculate duty on alcohol content and check relief separately

The full non-draught beer rate in HMRC’s Alcohol Duty calculation guidance is £22.58 per litre of pure alcohol for the relevant 3.5–8.4% ABV band, effective from 1 February 2026 and checked for this revision. The illustration uses that full rate for comparison; it does not claim this small producer is ineligible for relief or should pay that rate.

For the 36,000 bottles assumed to pass the duty point: 36,000 × 0.5 litres × 0.04 ABV = 720 litres of pure alcohol. At the full rate, 720 × £22.58 = £16,257.60, or £0.4516 per bottle. Use 0.04 for 4%, and distinguish litres of beer from litres of pure alcohol. All units in this example have the same strength; mixed products need separate calculations.

Small Producer Relief eligibility depends on more than this year’s illustrated output, including the producer’s overall production and relevant licensing arrangements. Checking it is a priority at this scale. Replace the full-rate comparison with the properly established rate before relying on the forecast. These 500ml bottles are not an assumption of qualifying draught packaging.

Under HMRC’s duty-liability guidance, the duty point and the customer’s payment date are different events. The model assumes the unsold stock remains appropriately in duty suspension and reserves the illustrated duty on dispatched bottles, including amounts not yet due for payment. It does not assume losses, samples or other removals are automatically duty-free; account for their actual treatment separately. Customer credit cannot be used to postpone a duty liability.

Test the cash commitment before scheduling more batches

Besides the production inputs, assume £0.10 distribution cost per invoiced bottle (£3,600), the £18,000 director cost and £10,000 annual overheads for premises, insurance, maintenance, administration and marketing. The overhead allowance excludes the process energy already in batch inputs. No extra staff or borrowed equipment are hidden in these figures.

Illustrative VAT-exclusive cash planning bridge — stated annual payments and duty reserve
ItemAll invoiced sales collected3,000 invoiced bottles still unpaid
Customer receipts, excluding VAT£93,600£85,800
All non-labour production inputs£38,880£38,880
Full-rate duty paid or reserved£16,257.60£16,257.60
Distribution£3,600£3,600
Working-director business cost£18,000£18,000
Other annual overheads£10,000£10,000
Total paid or reserved£86,737.60£86,737.60
Planning headroom / (gap)£6,862.40(£937.60)

This is not net profit or an actual bank balance. It subtracts spending on all production, including stock still held, and reserves duty that may be paid later. A profit and loss account needs proper inventory costing and depreciation; the bank forecast must include VAT, tax, equipment, finance and exact due dates. For these sales the standard VAT rate is 20%, so a £2.60 net invoice unit is £3.12 including VAT. The table deliberately removes VAT throughout to isolate the operating issue.

One decision to test: can four batches be postponed without losing any of the 36,000 sales? Twenty batches would fill exactly 36,000 bottles and avoid £6,480 of the stated inputs. Keeping receipts, sales-related duty, delivery, director cost and overheads unchanged, the checkpoint improves from a £937.60 gap to £5,542.40 headroom. It does not count a labour saving.

VAT-exclusive cash planning checkpoint: minus £937.60 with 24 batches, compared with £5,542.40 if four batches can be postponed without losing sales.
Same invoiced and paid sales, duty comparison and fixed commitments; only four batches of production inputs are postponed. This is planning headroom before excluded cash flows, not profit. Open the larger batch-timing comparison.

The alternative leaves no finished-stock buffer against the stated sales total. It only works if recipes, yield, shelf life, order dates and the brewing schedule support it. Do not cancel committed production simply because the annual arithmetic fits. Use a dated forecast to check the lowest cash point before receipts, outstanding duty after the year end and the next batch’s bills. Neither number above proves that the opening funding is sufficient.

Turn the example into an evidence-backed plan

Before committing funds, replace the illustration with a small set of documents that agree with each other:

  • Commercial evidence: dated buyer trials, paid reorders, actual net prices, case sizes, returns and credit terms. Show who is responsible for selling and collecting debts.
  • Production evidence: tested recipes and ABV, saleable yield, tank occupation, packing work, quality release, storage and shelf life. Match supplier quotations and installation requirements to the bottleneck you actually have.
  • Premises and permissions: confirm the proposed use, utilities, safe working arrangements and waste handling before signing. In England, trade-effluent and environmental discharge requirements depend on where the waste water goes; ordinary drainage is not evidence that brewing effluent can be discharged. For trade effluent to the sewer, establish consent or an agreement with the sewerage undertaker.
  • Approvals and product information: establish the relevant Alcoholic Products Producer Approval before production and confirm its premises and activities. Check local food-business registration, including the applicable advance registration period. For bottles, verify net quantity, ABV and other label information and allergen requirements. An exemption from a full ingredients list does not remove the need to declare relevant allergens.
  • Funding evidence: equipment and site quotations, deposits, pre-opening costs, working capital, contingency and dated finance terms. Record each founder’s actual contribution and responsibilities. A proposed grant is not secured funding.

This case is scoped to England and wholesale bottled beer. A taproom, direct retail sales, contract production or movements to other UK nations need their own operational and regulatory checks. Expand only when repeat demand, capacity, margins and the cash calendar support the decision.

For a structure to adapt to your own business, explore the Bsness brewery business plan. Keep the narrative and forecast consistent when you change the channel, batch schedule or payment terms.

Stefano Ventura, founder of Bsness.

About the author — Stefano Ventura

Stefano Ventura is the founder of Bsness. His work focuses on budgeting, business planning and the development of Bsness software. The brewery and commercial figures in this example are fictional.

About Bsness