A campsite business plan needs to connect the pitches you can actually sell with the nights guests will book, the cost of running the site and the cash needed before they arrive. In this worked example, 20 tent pitches open for 180 nights generate £64,800 of revenue excluding VAT and £9,000 of operating profit. Losing ten peak-season nights cuts that profit to £3,600.
The useful part is the connection between those numbers. The example below shows the proposal, seasonal sales assumptions, operating budget and weather test, then identifies what must be added before making an investment or funding application.
About this example. This is a fictional planning exercise for a small limited company established in England. It assumes a leased, equipped campsite with 20 non-electric tent pitches, shared toilets and showers, and no pods, caravans, shop or catering. All prices, occupancy and costs are illustrative inputs, not UK averages, supplier quotations or results from a real campsite. The company is assumed to be voluntarily VAT-registered. Permissions and demand still need to be verified for the actual site.
The proposal: a small site with a defined season
The proposed offer is straightforward: a quiet base for couples and small families bringing their own tent, with reliable washing facilities and clear information about access, pitch sizes and site rules. The model sells one pitch for one night as its unit of activity. The assumed tariff covers one tent and up to two adults; there is no income from extras in the forecast.
The business would take direct bookings through its own website. Its commercial task is to fill the quieter part of the season without relying on discounts that erase the margin. The owner would handle bookings, arrivals, daily site checks and supplier coordination, with paid seasonal help for cleaning and relief cover.
This is an operating example for a site whose main facilities already exist. Buying land, constructing a shower block or adding glamping units would create a different investment and operating plan. Before agreeing a lease, establish who pays for drainage, major repairs, utilities and reinstatement, and whether the permitted use and opening dates support the proposed season.
Build the sales forecast from pitch-nights
Twenty pitches over 180 opening nights give 3,600 available pitch-nights. Divide that capacity into 60 peak nights and 120 shoulder-season nights. Here, “shoulder” means the remaining opening nights in this particular plan, not a fixed UK-wide calendar.
| Assumption | Peak season | Shoulder season | Total |
|---|---|---|---|
| Opening nights | 60 | 120 | 180 |
| Available pitch-nights | 1,200 | 2,400 | 3,600 |
| Assumed occupancy | 90% | 45% | 60% of opening capacity |
| Sold pitch-nights | 1,080 | 1,080 | 2,160 |
| Price per pitch-night, including VAT | £42 | £30 | £36 weighted average |
| Revenue excluding VAT | £37,800 | £27,000 | £64,800 |
The peak calculation is 20 × 60 × 90% = 1,080 sold pitch-nights. At £42 including VAT, the net selling price is £35, so revenue is 1,080 × £35 = £37,800. The shoulder calculation produces the same number of sold nights but only £25 of net revenue per night.
Guest charges total £77,760, including £12,960 of output VAT. HMRC treats tent pitches as standard-rated accommodation; the standard VAT rate is 20%. The historic temporary hospitality reductions do not apply to this example. Voluntary registration is possible below the registration threshold, but this assumed choice is not a recommendation for every operator.

Occupancy is a capacity measure, not a profit measure. The two seasons sell equal numbers of pitch-nights, yet the shorter peak period contributes more revenue. The 60% occupancy figure uses only the 180 opening nights; it is not occupancy across all 365 nights of the year. Likewise, 2,160 pitch-nights are not 2,160 guests or bookings.
What would make the sales assumptions credible?
For an existing site, request booking records by arrival date, length of stay, pitch type, achieved price, channel and cancellation. Compare the same weeks across seasons and distinguish unavailable pitches from unsold ones. For a new operation, use dated local competitor checks and a measured enquiry or booking test; a national tourism growth figure cannot establish demand for these 20 pitches.
The 90% peak assumption is demanding. It needs evidence of actual demand for comparable dates and facilities. For the 45% shoulder assumption, identify who will book outside school holidays and how they will find the site. Track enquiries, conversion, cancellations and the cost of obtaining each booking before increasing advertising spend. No customer survey, advance bookings or local price study has been collected for this fictional example.
Turn those sales into an operating budget
The model allows £5 of variable cost for each sold pitch-night: payment processing, consumables and the usage-related part of water and energy. It assumes direct bookings, so it contains no separate online travel agent commission. If an intermediary is used, add its actual charges and recalculate the margin.
Annual fixed cash operating costs are £42,000. This includes £18,000 for owner-director remuneration and associated employer costs, £6,000 for seasonal help, £8,000 for rent and £10,000 for other running costs. These are cost allowances, not stated wage rates or proof that a full-time staffing rota is affordable.
| Item | Calculation or scope | Annual amount |
|---|---|---|
| Revenue | 2,160 sold pitch-nights; VAT excluded | £64,800 |
| Variable costs | 2,160 × £5 | £10,800 |
| Contribution | Revenue less variable costs | £54,000 |
| Fixed cash operating costs | Owner/director and seasonal labour, rent and other running costs | £42,000 |
| Operating result before depreciation | Contribution less fixed cash operating costs | £12,000 |
| Depreciation | Illustrative annual charge on equipment and improvements | £3,000 |
| Operating profit | Before interest and Corporation Tax | £9,000 |
The £10,000 of other running costs comprises £2,800 of standing utility and waste costs, £2,600 of insurance and business rates, £1,800 of maintenance, £2,000 of marketing and booking software, and £800 of accountancy and administration. Check each against the actual site: no rate relief or insurance recovery is assumed.
Revenue and costs are stated excluding recoverable VAT; wages and other non-VAT items remain at their full cost. The depreciation allowance must be replaced by the actual asset schedule. Interest, Corporation Tax, capital expenditure, loan principal and changes in working capital are outside this operating calculation. Consequently, £9,000 is neither net profit after tax nor cash available to withdraw. Loan principal belongs in the cash forecast, not among profit-and-loss expenses.
Before accepting the labour allowance, build a rota covering cleaning, arrivals, maintenance, days off and emergencies. Cost the required hours with applicable pay, holiday, pension and employer obligations. If the owner needs more remuneration or the site needs more cover, increase the cost in the same model. The forecast does not become viable by treating essential labour as free.
The weather test: ten peak nights lost
Assume waterlogged ground forces the whole site to close for ten peak nights. The remaining peak nights still achieve 90% occupancy; shoulder bookings and prices are unchanged. There is no rebooking, cancellation income or insurance payment, and the £42,000 annual fixed cost remains payable.
Closure removes 20 × 10 = 200 available pitch-nights and 180 expected sales. Lost net revenue is 180 × £35 = £6,300. Avoided variable costs are 180 × £5 = £900, leaving a £5,400 loss of contribution.
| Annual operating measure | Base plan | Ten peak nights closed |
|---|---|---|
| Available pitch-nights | 3,600 | 3,400 |
| Sold pitch-nights | 2,160 | 1,980 |
| Revenue excluding VAT | £64,800 | £58,500 |
| Variable costs | £10,800 | £9,900 |
| Fixed cash operating costs | £42,000 | £42,000 |
| Depreciation | £3,000 | £3,000 |
| Operating profit before interest and tax | £9,000 | £3,600 |

This is a 60% reduction in operating profit from losing 5.6% of the planned opening nights. Actual storm damage, additional cleaning or repair costs would make the result worse; they are not included in the £3,600.
Could more shoulder bookings replace the loss? Each additional shoulder pitch-night contributes £25 − £5 = £20 before extra fixed or marketing costs. Recovering £5,400 therefore requires 270 additional pitch-nights. Shoulder occupancy would need to rise from 1,080 ÷ 2,400 = 45% to 1,350 ÷ 2,400 = 56.25%.
There is enough unused capacity on paper, but that does not establish demand. The recovery also needs saleable dates still to come, enough staff cover and bookings at the assumed price. If attracting those nights costs another £1,000, the recovery target rises to (£5,400 + £1,000) ÷ £20 = 320 extra pitch-nights. Discounting the price changes it again. Use this test before promising that a longer season will repair a poor summer.
Cash and funding: complete the calendar before committing
The annual operating result cannot tell you whether there is enough cash to open. Rent, insurance, repairs and software may be payable before the first stay. Equipment purchases and refundable deposits may also fall due before any VAT recovery or loan drawdown.
Build a monthly cash forecast with an opening bank balance and a separate line for each of: owner funding, finance receipts, customer deposits, final booking payments, refunds, operating payments, capital purchases, VAT, tax and loan repayments. Check the actual due dates during the tightest months, including the winter after the season. Do not count both the original booking value and its deposit as separate sales.
For example, £12,000 of opening cash plus £6,000 of guest deposits less £10,000 of pre-opening payments leaves £8,000 in the bank. That arithmetic does not make £8,000 spare cash: the stays have not yet been delivered, some money may need to be refunded, and other bills remain due. Under HMRC’s deposit rules, advance payments generally create a VAT liability when received. At the assumed 20% rate, £6,000 including VAT contains £1,000 of output VAT; the return payment also depends on allowable input VAT and adjustments.
For this leased-site proposal, prepare a dated funding schedule covering the lease deposit and advance rent, surveys and professional fees, any equipment or improvement work, pre-opening expenses, working capital and contingency. Match each payment to confirmed funding and its availability date. Separate recoverable VAT from its cash timing. An application for a grant is not secured funding.
The amount needed cannot be inferred from the £9,000 operating profit. It depends on the lease, condition of the facilities, opening cash and payment terms. The example supplies an operating model and stress test; it is not a complete three-year financial forecast or a lender-ready funding package.
Conditions for taking the plan forward
The decision is conditional: this site needs evidence that the proposed season and prices are achievable, that the labour budget covers the work, and that the business can fund both a weaker summer and the following closed season.
- Establish the site’s permitted capacity and dates. For England, check the camping licence and planning requirements with the relevant council. Licence conditions can affect layout, the number of tents and washing facilities. The 180-night model is not a temporary pop-up assumption. A planning route and a site licence are separate checks; do not treat a short-term exemption as permission for the whole season.
- Verify facilities before pricing the lease. Obtain evidence about water supply, toilet and shower capacity, drainage, access and maintenance responsibilities. If the site uses a septic tank or treatment plant, check the applicable sewage discharge rules and permit position. Existing equipment does not establish that it is suitable for the proposed demand.
- Put a workable closure plan behind the weather scenario. Follow the Environment Agency’s campsite flood-risk guidance for England. Identify who monitors warnings, decides to close, contacts guests and manages evacuation. Keep the site map and safe routes accessible, train staff and check insurance scope. The financial scenario does not set a safe threshold for remaining open.
- Replace assumptions with evidence. Keep a dated record of booking history or demand tests, achieved prices, staff cover, quotations and funding terms. Record what has actually been obtained and what remains unconfirmed. Recalculate when pitch availability, costs or the opening calendar change.
A useful first decision is whether the project still works with fewer peak nights and realistic owner pay. If it depends on unproven shoulder demand or spending deposits needed for future stays, resolve that weakness before committing to expansion.
To develop the narrative and forecast for your own site, explore the Bsness campsite business plan. Keep the pitch mix, prices, staffing and cash calendar consistent when adapting the example.