A property development business plan should show what you will buy, what it will cost to deliver, how it will be funded and how the money comes back. In this example, a company buys an existing house for £250,000 and plans a £450,000 resale. Its £421,800 project budget, including a £9,600 contingency, leaves £28,200 before Corporation Tax. A lower sale price combined with higher works costs and a three-month delay turns the result into a £6,300 loss.

The useful question is whether the deal still meets your investment criteria after those risks. A positive headline profit alone does not settle that question.

Declared simulation — England. This is an invented buy–refurbish–sell example for a UK-resident limited company, reviewed on 9 November 2026. There is no real property, address, company, contractor quotation, valuation or loan offer behind the figures. The house is an existing, recently occupied freehold dwelling, retained as one house. The example excludes new builds, conversions, changes of use, long-empty-home reliefs, higher-risk buildings, mixed-use schemes and rental income. Amounts include irrecoverable VAT where applicable. Check the actual property, tax position and funding terms before making a commitment.

What this property business would do

The proposed company would buy one house in an area its director can inspect and manage, commission a defined refurbishment, and sell the finished property to an owner-occupier. It takes the purchase, construction and resale risk itself. That differs from a construction contractor’s business plan, where a customer owns the property and pays the contractor for work.

One director would handle acquisition decisions, appointments, budget control and sales. An external solicitor, surveyor, accountant and main contractor would provide the services actually needed. The £12,000 director and administration allowance below covers the assumed company cost of that role and routine administration for 12 months; it is not an estimate of the director’s net income. There is no invented professional team or track record.

The company would have one active project, not three simultaneous sites supported by the same cash. Its operating plan is acquisition in month 1, six months of works in months 2–7, then completion checks, marketing and conveyancing, with sale proceeds arriving at the end of month 12. These are planning assumptions, not typical completion times. A second purchase would require its own appraisal and committed funding, without assuming the first sale has already happened.

Test the £450,000 exit before offering £250,000

The £450,000 gross development value (GDV) means the assumed completed sale value of this one house. It is not profit and does not prove what a buyer will pay. Build an evidence file before using it: recent completed sales of genuinely comparable homes, floor area, condition, tenure, location, sale dates and differences from your proposed specification.

HM Land Registry’s sold-price search is a starting point for England and Wales. Registration delays and coverage limits mean it is not a complete, real-time view of local transactions. Add inspections, a surveyor’s assessment and written local-agent advice on achievable price and likely selling time. Asking prices and a city-wide house-price index cannot establish the value of this particular house.

The proposed marketing route is one appointed local estate agent, suitable portal exposure, a clear specification and organised viewings after the property is ready. The £9,000 sales allowance includes agent, marketing and legal costs, with VAT where charged. Obtain an actual fee agreement: the simulation holds this allowance fixed in the scenarios below, rather than assuming a percentage commission automatically falls with the price.

No comparables have been collected for this invented property. Until price, scope and title checks are supported, both the £250,000 purchase and £450,000 exit remain assumptions.

Put acquisition, tax and finance into the whole project budget

The works quotation is assumed to be £80,000 plus £16,000 VAT for a non-structural refurbishment, including labour, materials, site preliminaries, waste removal and the agreed completion documentation. No extension, change of use or new planning consent is assumed; any additional design, approval or certification cost must be included in the quotation or professional-fee allowance, or added before proceeding. For this ordinary refurbishment and exempt resale of an existing house, the £16,000 is treated as a cost, not an expected VAT refund. The company is assumed to make only this exempt property sale and is not VAT-registered for this activity. New housing, qualifying conversions and some empty-property works can have different treatment: check HMRC’s land and property guidance and VAT Notice 708 against the actual facts.

Illustrative project budget — GBP, England, including irrecoverable VAT
CostBudgetBasis
House purchase£250,000Existing freehold house; deposit is part of this price
Stamp Duty Land Tax£15,000Company higher residential rates assumed; calculation below
Acquisition and project professional fees£5,000Legal work, surveys and professional checks; VAT included where charged
Refurbishment contract£96,000£80,000 + £16,000 VAT
Works contingency£9,60010% of gross works cost; a funded reserve
Holding costs£5,400£450 a month for 12 months
Director and administration£12,000£1,000 a month for 12 months
Selling and sale legal costs£9,000Fixed gross allowance for this example
Loan arrangement fee£3,600Assumed 2% of £180,000 principal
Loan interest£16,200£180,000 × 0.75% × 12 months
Total budget including contingency£421,800All lines above, counted once
Sale value less that budget£28,200£450,000 − £421,800; before Corporation Tax

The £15,000 SDLT calculation uses HMRC’s higher residential rates: £125,000 × 5% + £125,000 × 7% = £6,250 + £8,750. This assumes the company transaction falls within those rules, with no relief or non-resident surcharge. Corporate SDLT rules also contain different provisions for certain higher-value purchases. Do not apply this £15,000 figure to another price, property type or territory; Scotland and Wales use different property transaction taxes.

The £9,600 contingency is available funding, not automatically an expense. If none is needed, projected costs are £412,200 and the project result is £37,800 before tax. If it is all used on extra works, costs reach £421,800 and the result is £28,200. Do not deduct the reserve and then deduct the same overrun again.

This is a project appraisal, not statutory company accounts. The property is being bought for resale; the purchase must not disappear from the calculation or be treated as a vehicle-style depreciation charge. An accountant should reconcile cost recognition, unsold property, company overheads and Corporation Tax across the actual accounting periods. The project result is not a tax-free capital gain or a dividend allowance.

Fund the deposit, the works and the months before sale

Assume shareholders pay in £260,000 before exchange and a lender advances £180,000 in full at purchase completion. Total cash funding is £440,000. This is an illustrative funding structure, not an available product or a proposed lender’s approval. The loan is assumed to charge simple interest of 0.75% a month on the unchanged principal, paid monthly, with a £3,600 arrangement fee paid separately and principal due after month 12. No retained interest, staged drawdowns, compounding or exit fee is assumed.

The £25,000 exchange deposit is part of the £250,000 purchase price. At completion, only the remaining £225,000 purchase price is paid. Of the £5,000 acquisition and professional-fee allowance, £2,000 is paid at exchange and £3,000 at completion. SDLT is funded at completion for payment by the applicable deadline.

Budget cash checkpoints — assumes the full £9,600 contingency is used
WhenCash movementBank balance
Before exchangeShareholder equity +£260,000£260,000
Month 0: exchangeDeposit −£25,000; professional fees −£2,000£233,000
Month 1: acquisitionLoan +£180,000; completion costs −£246,600; monthly costs −£2,800£163,600
Months 2–7: worksWorks −£96,000; monthly costs −£16,800; contingency used −£9,600£41,200
Months 8–12: before saleFive further monthly costs of £2,800£27,200
Month 12: sale completedProceeds +£450,000; selling costs −£9,000£468,200
Month 12: loan repaidPrincipal −£180,000£288,200

Month-1 completion costs are £225,000 price balance + £15,000 SDLT + £3,000 professional fees + £3,600 loan fee. The recurring £2,800 is £450 holding costs + £1,000 director/administration + £1,350 interest. Works are assumed paid at £16,000 a month in months 2–7, with all contingency spending in month 7.

Check the actual dates within each month, not just these grouped balances. The loan must reach the solicitor in time for purchase completion; an assumed later drawdown cannot fund an earlier payment. The cash checkpoints assume no customer deposit is available to spend, no grants or tax refunds, no contractor credit and no second project.

At the end, £288,200 in the company bank reconciles to £260,000 shareholder capital plus £28,200 project profit before tax. Repaying the £180,000 principal uses cash but is not a second project cost. Likewise, the £450,000 sale receipt is not £450,000 of profit. Tax and other liabilities must be settled before deciding what may lawfully be returned to shareholders.

Budget-case company bank cash: before sale £27,200; after sale and selling costs £468,200; after repaying £180,000 loan principal £288,200.
Simulation, GBP, before Corporation Tax. The full works contingency is used. The final balance contains £260,000 shareholder capital and £28,200 project profit, so it is not all earnings. Select the chart to view it at full size.

Construction Industry Scheme treatment also needs checking. A business buying and renovating for resale must not assume it is simply a private householder or automatically outside CIS because it is small. HMRC distinguishes property investors and developers. Have the accountant confirm the classification and any registration, verification and payment duties. The cash model assumes the main contractor has verified gross-payment status if CIS applies; a required deduction would be reserved for HMRC, not treated as a discount on the works.

A delayed sale changes the loan maturity as well as the profit

Test price, cost and time separately before combining them. Here, an extra 10% on the £96,000 works uses exactly £9,600 of contingency. A three-month delay adds £4,050 interest, £1,350 holding costs and £3,000 director/administration, plus an assumed £3,600 extension fee: £12,000 extra in total.

That extension is a scenario assumption, not a contractual right. The loan is due at month 12. Without agreed extension or alternative committed funding, the company cannot assume it may wait until month 15 merely by paying more interest. A positive bank balance below the £180,000 repayment does not solve that maturity problem.

Illustrative exit scenarios — before Corporation Tax
ScenarioSale proceedsTotal project costsProject result
On time; contingency unused£450,000£412,200£37,800 profit
On time; works 10% over quote£450,000£421,800£28,200 profit
Three months late; original works cost£450,000£424,200£25,800 profit
Combined: sale 5% lower, works 10% higher, three months late£427,500£433,800£6,300 loss

The combined case is £412,200 base costs + £9,600 extra works + £12,000 delay costs = £433,800 against £427,500 proceeds. The contingency is used once. With the assumed extension fee paid in month 12 and three more £2,800 monthly payments, cash falls from the budget case’s £27,200 to £15,200 before the delayed sale. After sale costs and loan repayment, £253,700 remains: £260,000 equity less £6,300 loss, before any tax effects.

If the director chooses a £10,000 minimum cash floor, that combined case leaves only £5,200 above it. More delay, a failed buyer or further defects can use it. The floor is an internal assumption, not evidence that the company is adequately funded.

Project result before tax: contingency unused £37,800; works overrun £28,200; delay only £25,800; combined downside minus £6,300.
Simulation, GBP. The combined downside changes sale price, works and timing together. The other rows isolate the stated changes; they are alternative cases, not consecutive years. Select the chart to view it at full size.

Letting the house instead is a new business decision, not an automatic rescue. It would need an independently tested rent, an affordable and permitted finance route, landlord compliance, ongoing costs and a revised tax treatment. No rent or refinance proceeds are included here.

The purchase decision: this example fails its chosen hurdle

Suppose the director requires a 15% return on total project cost after the contingency allowance. That is a chosen investment criterion for this simulation, not a universal lender minimum. The £28,200 budget result divided by £421,800 cost is only 6.69%. Profit as a share of the £450,000 sale value is 6.27%; it is a different measure.

At the same £421,800 cost, a 15% profit-on-cost target would need £485,070 sale proceeds. Raising GDV in a spreadsheet does not make that price achievable. Alternatively, holding sale value, finance and the other allowances fixed, the maximum total cost would be £450,000 ÷ 1.15 = about £391,304. Recalculating SDLT in the same tax band gives an indicative purchase-price ceiling of about £221,500. That is arithmetic under fixed assumptions, not a valuation or an offer recommendation; a lower purchase price may change lending terms and other costs.

The decision in this plan is therefore not to commit at £250,000 under the chosen 15% criterion. First replace the unsupported exit value and works allowance with evidence, resolve title and funding conditions, and rerun the appraisal. A business plan is useful when it tells you to change or reject a deal as well as when it supports one.

Before exchange, the director’s approval file should contain:

  • Property and scope: title, tenure, access, restrictions, survey findings, a priced works schedule and excluded defects.
  • Permissions and duties: a check with the relevant authority on planning permission and building regulations, plus appropriate professional appointments. A developer is a commercial client under CDM, even when working on a house: allow adequate resources and confirm principal-designer/principal-contractor arrangements where required.
  • Price and exit: comparable completed sales, an independent assessment, agent terms and a realistic conveyancing period.
  • Funding: committed equity, written loan conditions, net advance, fee and interest basis, drawdown dates, security or guarantee requirements, maturity and the response to a delayed sale.
  • Control: one live cost-to-complete schedule, committed orders and variations, a dated cash forecast, tax provisions and a decision log updated when facts change.

The property and funding evidence comes before promising a pipeline of further projects. Do not count an unsold property’s projected profit as cash for the next deposit.

For the wider document structure, see our guide to writing a property development company business plan. If you want an editable planning product, review the Property development company business plan package and its stated contents. This article’s simulation is not a verified export from that product or a promise of funding. Homes England’s financial viability guidance explains the appraisal principles behind testing costs against value.

Stefano Ventura, founder of Bsness

About the author — Stefano Ventura

Stefano Ventura is the founder of Bsness and works on business planning and financial forecasting tools. This article uses a declared simulation whose assumptions must be replaced before making business decisions. Read about Bsness and the author.

Last updated: 9 November 2026. Reviewed for the stated England scope, acquisition costs, VAT, finance, contingency and sale timing.